Case Studies

Project Type
POTABLE WATER SERVICE
Location
SAN DIEGO, CALIFORNIA (USA)
Length / Hole Diameter
213 m (700 ft) / 762 mm (30 in) FUSIBLE C-905® PIPE
Divisions
The HDD Company

UPAS ST. PIPELINE

WORLD FAIR SITE LINE REPLACEMENT

Project Summary

San Diego is one of many American city’s replacing aging infrastructure at the end of its lifecycle. The metal lines providing drinking water to Balboa Park were installed for the World Fair in 1915, and were scheduled for replacement after a century of service.

Fusible PVC® pipe was selected for the line, as a thinner alternative to HDPE pipe (requiring less space to store and assemble onsite). The new line would run beneath Upas St. – a major highway intersecting San Diego’s most important park.

Key Challenges

Horizontal Directional Drilling (HDD) was deemed to be best construction method due to challenging topography than involved a rising elevation and a constrained work space.

The California Department of Highways (Caltrans) required protective casing for the section of line running under the highway. Once the pilot hole and reaming were completed, The HDD Company pulled the 762 mm (30 in) casing and 609.6 mm (24 in) line simultaneously. The line was ballasted by water to minimize frictional drag as the pipe was pulled.

Construction was planned to allow continued access to a park trail, a school, Boy and Girl Scout facilities and an off ramp. The only closures occurred over a single weekend while pipe was being pulled.

Services Provided

HORIZONTAL DIRECTIONAL DRILLING (HDD)

TUNNEL BORING / PIPE JACKING

Tunnel Boring and Pipe Jacking Systems are used to hydraulically install underground pipelines up to 4.2 m (168 in) in OD range within strict alignment and grade tolerances. The likelihood of settling or sloughing is very low. Wheel machines are equipped with various cutter heads and sand shelves. A closed-face attachment is available for boring in unstable ground conditions. This versatile system can be easily adapted to work with any jacking pipe, in any pipe joint length. It can accommodate a wide range of pipe diameters.

Tunnel Boring Machines are used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They can bore through hard rock, sand, and almost anything in between. Tunnel diameters can range from 1 m and exceed 15 m (3 ft to 49 ft).

The Crossing Group - The Tunneling Company - Tunnel Boring - Pipe Jacking - Trenchless Construction - Tunneling - Augering, Boring & Pipe Ramming

SLIP BORING

A boring technique commonly used for installing oil & gas pipelines ranging from 51 mm to 1067 mm (2 in to 42 in) in diameter without leaving casing in the ground. Product pipe is welded to steel casings and either pushed or pulled through the ground in sections. The casing is cut off and removed, leaving just the product pipe. Maximum installation length is 150 m (492 ft).

The Crossing Group - The Tunneling Company - Slip Boring - Trenchless Construction - Tunneling - Augering, Boring & Pipe Ramming

DOWN THE HOLE HAMMER

A pneumatic hammer is attached to the inside edge of the casing. The front of the DTH breaks cobles, boulders and even solid rock into small pebbles or dust. The spoil makes its way through the hammer and into the casing, where it is removed by airway augers.

The Crossing Group - The Tunneling Company - Down The Hole Hammer - DTH - Trenchless Construction - Tunneling - Augering, Boring & Pipe Ramming

GUIDED BORING

A Guided Boring Machine (GBM) is used to install 305 mm to 3.6 m diameter pipe (12 in to 144 in) with grade and alignment precision. It is commonly used for installations 50 m to 150 m in length (164 ft to 492 ft) or when line and grade accuracy is critical in displaceable soil. Our GBM is extremely versatile and our customers continually approach us with new applications.

The pipe installation involves a two-step process where launch and reception shafts are strategically located to minimize surface disruption. A pilot tube with a theodolite guidance system is then pushed through the ground at the precise grade and alignment specified in the design into the reception shaft. A reaming head is welded to the pilot tube and the casing and the pilot tube is used as a guide to install casing. The GBM can be used in conjunction with auger boring or pipe ramming methodologies.

The Crossing Group - The Tunneling Company - Guided Boring - Trenchless Construction - Tunneling - Augering, Boring & Pipe Ramming

PNEUMATIC PIPE RAMMING

Pipe Ramming is used in a wide variety of soil types including gravel, cobble or sand. A pneumatic hammer is attached to the back of the casing pipe and driven through the material at any angle: from horizontal to vertical. The material is cleaned out of the pipe using an auger boring machine. Pipe Ramming methods are used for pipe diameters of 305 mm to 3.6 m (12 in to 144 in).

The Crossing Group - The Tunneling Company - Pneumatic Pipe Ramming - Tunneling - Augering, Boring & Pipe Ramming