Case Studies

The Crossing Group has delivered industry-leading trenchless construction solutions for clients throughout North America. Discover some of our key projects and achievements in our collection of case studies.

Pine River

Adapting to Unexpected Challenges with Hydro Hammer Technology

55.6693378
-121.6748253
Circle City

Improving an Aquatic Habitat with a Large-Diameter Culvert Installation

65.7998034
-144.3683654
Pink Mountain

Tunneling through Challenging Ground Conditions with Hydro Hammer Technology

57.0390324
-122.5103398
Silverhope Creek Microtunnel

Crossing Beneath an Archaeological Site

49.3663838
-121.4743965
Jacko Lake Microtunnel

Overcoming Project Challenges with Microtunneling

50.6106459
-120.4225192
Sarcee Trail Crossing

Collaborating To Complete Crossing

51.0804389
-114.1937649
Confederation Way

Alternative To Microtunneling

56.7559128
-111.4531332
Gunn Water Main

Longest Guided Boring Completion

53.7311461
-114.358322
Banff Rail Line

Drainage/ Migration Culvert

51.162974
-115.4653607
Railway Culvert Installation

A Solution To Unexpected Boulders

52.763444
-108.2850019
Oahu Research Station

Tying Island Into Mainland Utilities

21.434169
-157.7899571
Rehoboth Beach

Ingenuity Saves Client Millions

38.709393
-75.0772549
Eureka Subsea Cables

Connecting Fibre Optic Cables Internationally

40.756799
-124.1975879
Deerfoot Trail Pipeline

12-Lane Freeway Crossing

51.0370339
-114.0096809
Embarcadero-Potrero

Shore To Bay Transmission Install

37.7543553
-122.3938586
Cache Creek Gas Line

Side-By-Side HDD Installation

38.709862
-122.0498199
Upas St. Pipeline

World Fair Site Line Replacement

32.7397629
-117.1527926
Fox Creek / Namao Pipeline

Complex Multi-Crossing Project

54.4064508
-116.8559411
Shaganappi Golf Course

Utility Line Replacement

51.0453748
-114.127386
Buckinghorse River

Environmentally Sensitive Crossing

57.3879779
-122.8551218
Edmonton / Hardisty Pipeline

Horizontal Directional Bore

53.5237349
-113.5044049
Edmonton O&G Terminal

New Install Among Live Lines

53.5417761
-113.3081233
St. Albert Sanitary Trunk

Installing Beneath River & Pathway

53.6359585
-113.6370473
Rover Pipeline

Importance Of Environmental Best Practices

40.3559079
-83.9883427
Murray River

Large Diameter Casing Installation

55.1140063
-121.0348865